Algeria and Niger advance Trans-Saharan gas pipeline plan
Published
Algeria and Niger are moving ahead on the Trans-Saharan gas pipeline, with Niger's route changes now under review. Work on the Algerian section has started, and the Niger section will link Nigerian gas facilities to Algeria's network. An Algerian delegation is in Niamey, Niger's capital, from 17 to 20 November 2026.
Several steps still remain before the link with Nigeria can be built. Those steps are the focus of this visit.
According to a Sonatrach statement issued on Thursday, 19 November, the visit aims to speed up preparation of the Niger section. Talks focus on route studies and the data needed for construction. The delegation includes officials from the Ministère algérien des Hydrocarbures (Algeria's Ministry of Hydrocarbons), staff from Sonatrach's pipeline transport unit and from the Entreprise nationale de canalisation (ENAC, a Sonatrach subsidiary). On Tuesday, 17 November, the group met Abdoulkarim Mohamed Ali, secretary general of the Ministère nigérien du Pétrole (Niger's Ministry of Petroleum). ObservAlgérie first reported the visit.
The project is known in French as the gazoduc transsaharien (TSGP). It has recently sped up, and preparations are now moving ahead in Niger.
Teams must still define the regulatory studies and services to carry out before work can open on the Niger section. Niger's authorities have proposed several changes to the original route. These changes must be examined to confirm the final route and assess their technical effects. The delegation's mission runs until 20 November 2026.
Source: ObservAlgérie
Sources: ObservAlgérie