At Svinica – Ďurkov, three new wells are finished. The next step is building a hot water pipeline
Published
Three new wells have been completed in the Svinica – Ďurkov area. During tests, the geothermal water reaches a temperature of 143 degrees Celsius. This result is important for the next development of the project, which is meant to use heat from deep sources.
Geothermal water is water that is naturally heated in deep layers of the earth. The wells are used to bring this water to the surface so that it can be used. According to the information in the article, the tests showed that the water has a high temperature, which is very important for using the heat.
The next step is building a hot water pipeline. A hot water pipeline is a pipe that carries hot water or steam from the source to the customers. The Ministry of Investments and other institutions are involved in preparing this project. However, the available information does not give a specific schedule for construction or the scope of the work.
So far, it is known that the wells are finished and that the geothermal water reached the expected temperature during the tests. The residents of the region will follow the further development of the project, including the start of construction of the hot water pipeline, in the coming months.
Sources: Korzár
More Slovakia news
- Vitamin D and sleep: study shows a 23-minute difference
- Fico wants to stay in power until September 2027, says minister Kaliňák
- What should you avoid during Advent? Old superstitions about the pre-Christmas period
- Vitamin D and sleep quality: what new research suggests
- Christmas markets in Bratislava will run until 3 January 2027, and some food and drinks will be at discounted prices
- Russian ships turn back in the Mediterranean after Ukrainian attack on a corvette
- Fatigue, thirst and frequent urination can be warning signs
- New poll shows a change beyond the statistical margin: first time since the elections